Busing wastewater therapy system
1 View – Replace Content material: 22-04-2025 09:03

Censored content material

The bus station is a spot to pay attention numerous automobiles and passengers day by day. Automotive washing actions, hygiene of automobiles, actions of drivers and passengers … create a small quantity of wastewater, comprise grease, detergent, suspended solids, microorganisms and lots of different pollution. Due to this fact, whether or not the scale of the bus station is massive or small, it’s essential to equip Waste water therapy system To guard the surroundings. Within the content material under, please refer to at least one Busing wastewater therapy systemcapability of 200m3/day. Evening.

Busing wastewater treatment system

1. Supply producing wastewater on the bus station

Water from actions (private hygiene) of staff on the bus station;

Water from actions of people, enterprise households and models;

Water from cooking meals on the cafeteria (water into meals, kitchen bathroom water, cooking tools, …);

Water from the actions of the driving force and passengers;

Water from industrial hygiene: workplace hygiene, terminal, ready space of ​​passengers;

Water from consuming water filtration actions;

Wastewater assortment system.

2. Confer with the bus station wastewater therapy system, capability of 200m3/day.

Waste water assortment system

Wastewater from WC, Lavabo> Septic tanks> centralized techniques, capability 200m3/day. Evening> Receiving supply.

Wastewater from eating space> Grease separating tanks> centralized techniques, capability of 200m3/day. Evening> Receiving supply.

Processing course of

Waste water> Assortment tank> Air -conditioning tank> Cardio tanks> Cardio tanks> settling tanks> Disinfection tanks> Sand filter tanks> Receiving sources.

Processing course of

Assortment tank

The general wastewater of the whole bus station is led to the gathering tank of the therapy system after the mixture of the trash with a dimension of 10mm to take away sediment, waste and rubbish.

Air conditioner

In air conditionerbelow the impact of provide airflow, the water within the tank is disturbed to keep away from sedimentation and anaerobic decomposition. As well as, the air conditioner tank additionally helps to stabilize the movement and focus of wastewater resulting in a fuel tank.

Air conditioning tank is very important in the wastewater treatment system
Air-con tank is essential within the wastewater therapy system (Art work)

Air tank

Xem thêm  Prestigious wastewater remedy firm in Gia Lai

Within the fuel deficiency tank, different microorganisms will convert nitrate (NO3-) into different gases reminiscent of NO2, NO and N2 (nitrogen fuel), based on the next response: NO3- → NO2- → NO → N2O → N2. The method of changing nitrate into nitrogen fuel is named the Denitrification (Denitrification) course of. Main reactions via assimilation (biomass growth) n are metabolized little or no about 12-14% of the biomass on this process. Wastewater is then led to cardio organic tank.

Cardio

In cardio organic tank, microorganisms within the type of cardio type (activated sludge) will decompose the natural substances within the wastewater into easy inorganic substances reminiscent of CO2, H2O … based on the next response:

Natural matter + Cardio microorganisms + nitrogen → H2O + CO2 + New biomass + …

In cardio organic tank, nitrogen redeemment assimilation course of exists in water within the type of ammonia (NH4+)]into nitrate (NO3-) concurrently happens with the BOD discount course of within the tank.

Ammonia (NH4+) is oxidized in 2 steps:

  • Step 1: NH4 + oxidized to NO2- because of the results of Nitrosomonas micro organism based on the response: NH4 + + 1.5 O2 → NO2- + 2H + + H2O
  • Step 2: NO2-NO3 oxidation- because of the results of Nitrobacter micro organism on the response: NO2- + 0.5 O2 → NO3

Sedimentation tank

Wastewater from cardio organic tank is led to the settling tank, on the sediment tank, the stable part separation technique of activated sludge combination and water. Many of the sludge from the pump is pumped to the cardio organic organic tank to take care of the secure activated sludge focus, the residual sludge might be pumped to the mud compressed tank. On the mud tank with a secure time, the sludge is compressed to a shallow degree of 1.5 – 2.5%, water fertilizer from the mud tank collects to the therapy tank for therapy. Water out of the settling tank will movement via the disinfection tank

Disinfect

Waste water after the sedimentation tank is led to the disinfection tank based on the self -flowing mechanism. Right here, pathogenic micro organism might be destroyed with chlorine chemical compounds – it is a robust oxidant. When chlorine is uncovered to water, it should create a really robust hocl molecule: Cl2 + H2O «hocl + HCl

The quantity of chlorine used to disinfect wastewater is ready and quantified precisely because of the quantitative pump system, making certain the surplus chlorine within the water after therapy doesn’t exceed the permissible restrict specified based on the requirements.

Stress filter tank

Stress filter tank is the ultimate processing stage of the system, water after therapy meets environmental requirements based on QCVN 40: 2011/BTNMT, column B earlier than discharging into the receiving supply.

Pressure filtration equipment in the wastewater treatment system
Stress filtration tools within the wastewater therapy system (Art work)

Specs of processing tanks within the system










Stt

Classes

Amount

Specs

1

Oil tank

1

– Dimension: d × r × c = 2.95 × 1.4 × 3.5 (m);
200mm thick.
– Materials: Strengthened concrete

2

Air conditioner

1

– Dimension: d × r × c = 6.0 × 2.95 × 3.5 (m);
200mm thick.
– Supplies: Strengthened concrete m250, piles of melaleuca.
– Water retention time: 7 hours

3

Air tank

1

– Dimension: d × r × c = 7.2 × 1.4 × 3.5 (m);
200mm thick.
– Supplies: Strengthened concrete m250, piles of melaleuca.
– Water retention time: 4 hours

4

Cardio

1

– Dimension: d × r × c = 6.2 × 4.5 × 3.5 (m);


200mm thick.
– Supplies: Strengthened concrete m250, piles of melaleuca.
– Water retention time: 10 hours

5

Sedimentation tank

1

– Dimension: d × r × c = 3 × 3 × 3.5 (m); thick
200mm.
– Supplies: Strengthened concrete m250, piles of melaleuca.
– Water retention time: 2 hours

6

Disinfect

1

– Dimension: d × r × c = 3 × 1.7 × 3.5 (m); thick
200mm.
– Supplies: Strengthened concrete m250, piles of melaleuca.
– Water retention time: 45 minutes

7

Sludge tank

1

– Dimension: H × ((A+B)/2) × C =
3.0m × ((1.08+4.47)/2) × 3.5m; 200mm thick.
– Supplies: Strengthened concrete m250, piles of melaleuca.

8

Operator

1

– Dimension: d × r × c = 4.5 × 3.0 × 3.5 (m);
200mm thick.
– Supplies: Strengthened concrete m250, piles of melaleuca.

Above is a few details about the bus station wastewater therapy system, capability of 200m3/day. Evening. Wastewater therapy expertise will be designed otherwise at every bus station, relying on many components, together with: Traits and air pollution properties of wastewater, requiring the standard of the output wastewater, development space, system set up, funding prices, and many others.

You want recommendation, design, development, set up Busing wastewater therapy systemplease contact the environmental surroundings most via Hotline: 0938.857.768 For particular info recommendation, or ship an invite to the worth to e mail: congthongtin@moitruonghopnhat.com.

By

Trả lời

Email của bạn sẽ không được hiển thị công khai. Các trường bắt buộc được đánh dấu *